Product Detail :
|
Proposed deep screening by BCM including packing, ancillary works for a length of 25.77 kms. Proposed deep screening of shoulder and crib ballast for a length of 62.1 km. Construction of side drain in connection with the work of proposed through ballast recoupment of shoulder and crib ballast for 71.38 km. Collection and supply of machine crushed ballast including mechanical loading and unloading PRNT depot. Construction of boundary wall for a length of 10050 Mts. Annual maintenance of pathway for the year 2019 20 and 2020 21 in senior section engineer / pathway / section. Proposed trolley refuge for a length of 29 km from km 283/000 312/000 up line. Proposed constructions of drain for a length of 60.578 km. Proposed constructions of drain for a length of 8.15 mts. RCC retaining wall for a length of 825 mts. Proposed trolley refuge for a length of 52.1 kms. Proposed constructions of drain for length of 69.99 mts. Proposed deep screening of shoulder and crib ballast for a length of 16 kms. Complete track renewal (p) for a length of 32.20 km. Track renewal for a length of 19.60 km. Repairs to PWI office stores, sheds and compound wall at hundupur, penukonda & sri satyasai prasanti nilayam. Proposed repairs to approach road, colony road level crossings road in hindupur. Proposed repairs to station name board & provision of other signage boards at hindupur (72 nos). Proposed brightening of staff quarters, platform shelter, RUB and ROB and landscaping. Proposed through ballast recoupment of shoulder and crib ballast for a length of 30.4 km in senior divisional engineer / central section.
|
Tender Detail : |
Fnj South Western Railway
2
3
5
6
8
9
10
11
12
last Date for Submission of Bid for Above Tender 18-09-2019 Upto 15:00 Hrs.
for Details Log on to Website: Www.ireps.gov.in
sd/- Divisional Railway Manager/works,
nopub/117/aaas/prb/sbc/2019-20 South Western Railway, Bengaluru |
bengaluru - Mysuru Section: Sw-i: |
r
* 4,94,06,620/-1 8 Months
proposed Trolley Refuge for a Length of 52.1 Kms. Sw-ii: Proposed
constructions of Drain for Length of 69.99 Mts. Sw-iii: Proposed Deep
screening of Shoulder and Crib Ballast for a Length of 16 Kms. __________
bengaluru - Mysuru Section: Complete Rs. 9,78.39,685/-] 12 Months
track Renewal (p) for a Length of 32 20 Km. _______________ _________
bengaluru - Mysuru Section: Track | Rs. 5,63,54,827/- [ 12 Months
renewal for a Length of 19.60 Km
sw-i: Repairs to Pwi Office Stores. Sheds | Rs. 7,35,30,538/-fl2 Months
and Compound Wall at Hindupur. Penukonda & Sri Satyasai Prasanti
nilayam Sw-ii: Proposed Repairs to Approach Road, Colony Road Level
crossings Road in Hindupur Sw-iii: Proposed Repairs to Station Name
board & Provision of Other Signage Boards at Hindupur (72 Nos.). Sw-iv:
proposed Brightening of Staff Quarters, Platform Shelter, Rub and Rob
and Landscaping._____________________ _ ________________________
proposed Through Ballast Recoupment of | Rs. 90,07,558/^8 Months
shoulder and Crib Ballast for a Length of 30.4 Km. in Senior Divisional
engineer / Central Section.
proposed Deep Screening By Bcm Including Packing, Ancillary Works for
a Length of 25.77 Kms. Sw-ii: Proposed Deep Screening of Shoulder and
cnb Ballast Foralength of 62.1 Km.________________________________
sw-i: Bengaluru - Dharmavaram Section:-1 Rs. 4,86,75,170/-1 8 Months
construction of Side Drain in Connection with the Work of Proposed
through Ballast Recoupment of Shoulder and Cnb Ballast for 71.38 Km ____
collection and Supply of Machine Crushed | Rs 3,01,71,675/^"* Months
ballast Including Mechanical Loading and Unloading Prnt Depot________
bengaluru - Tumakuru Section: | Rs. 7,67,87,013/-1 8 Months
construction of Boundary Wall for a Length of 10050 Mts.____ _________
annual Maintenance of Pathway for the | Rs. 4,49,16,573/-1 24 Months
year 2019-20 and 2020-2021 in Senior Section Engineer / Pathway I
tumakuru Section.___________________ ______________ _________
bengaluru - Jolarpet Section: Sw-i:
7
Rs. 6,53,15,840/-j~8months
proposed Trolley Refuge for a Length of 29 Km From Km 283 / 000-312 / 000
up Line. Sw-ii: Proposed Constructions of Drain for a Length Of60.578 Km.
kunigal Section: Sw-i: Proposed | R».4,06,06,440/-1 8 Months
constructions of Drain for a Length of 8.15 Mts. Sw-ii: Rcc Retaining Wall
foralength Of825 Mts.
open Tender Notice No. 23/sbc/19 of 20-08-2019
the Undersigned, on Behalf of the President of India, Invites E-tenders
for the Following Works.
si
no.
description of Work
approximate
value (in Rs.)
period of
completion
1
sw-i: Bengaluru - Dharmavaram Section:-
rs. 2,66,87,065/- 8 Months |